SOME OF THE JOBS EXECUTED IN THE PAST AND THEIR VALUES

S/N JOBS EXECUTED IN THE PAST CLIENT YEAR
  1.00 ELECTRCAL PROJECTS    
1.01 Construction of 33KV Switchyard for a 2x 10 MVA 33/11KV Transformer, Purchase and Installation of Electrical Control/Protection Devices in the 33KV Switchyard and Control room 33KV VCB, 33KV Transformer Control Panels, Tripping Units, and 110V DC. 25A Charger       University of Ibadan, Ibadan. 2012
1.02 Supply of different ratings of Transformers (33/11kv) and ancillary works to Oyo Central Senatorial District, Oyo State Ogun Oshun River Basin Development Authority, Abeokuta 2016
1.03 Provision and installation of 500KVA Transformers (11/0.415kv) and other ancillary works in Oyo South Senatorial District, Oyo State. Ogun Oshun River Basin Development Authority, Abeokuta 2017
1.04  Extension of 11kv line to the Central Administrative Building from Kuti Substation, construction  of 11kv Substation at Central Administrative Premises and provision of Electrical automatic  changeover distribution facilities at the existing Generator house at Central Administrative Building       University of Ibadan, Ibadan. 2016
1.05 Provision of Electrical Power Supply to the Admission Office, Food Technology Building, Electrical Engineering Laboratory Building and relocation of Tech LV AC 415V Line to feed new Agric engineering Building.       University of Ibadan, Ibadan. 2016
1.06 Extension of 11kv underground line from the existing 22kv Substation at the faculty of dentistry to the proposed 11kv Substation at Infectious Diseases Complex, university College Hospital, Ibadan       University of Ibadan, Ibadan. 2016
1.07 Extension of power supply to Immunology Building at College of Medicine, UCH, Ibadan       University of Ibadan, Ibadan. 2016
1.08 Rehabilitation of Ire Clay Products Limited Power Supply  which involved: 1.Supply and Installation of  1     MVA. 33/0.415KV Transformer 2. Installation of 630 Amp 33kv gang Isolator. 3. Installation of Sub-station  earthing/lightening Arrester. 4. Installation of 500m single cable for the transformer LT to connect the control room LVAC Panel. 5. Rehabilitation and commissioning of vandalized 415V LVAC Distribution panel. Odua Group of Companies. 2013
1.09 Construction of 33KV Feeder at Iseyin Transmission Station (132/33KV) OF PHCN Oyo State Rural Electrification Board Partner with ABSS International Mining Company Limited, Ibadan. 2013
1.10 Provision of a 33KVA Metering Device (Energy Meter) for T1-10MVA 33/11KV Transformer University of Ibadan, Ibadan. 2013
1.11 Repair and servicing of foster 100KVA 11/0.415KV Transformer University of Ibadan, Ibadan. 2013
1.12 Repair of T1 10MVA 33/11KV Transformer (2nd Transformer at the 33KV Substation) at the University of Ibadan.   University of Ibadan, Ibadan. 2012
1.13 Purchase and installation of 11KV control/ protective devices for the university of Ibadan, 2012 (IGR)   University of Ibadan, Ibadan. 2012
1.14 Servicing of 1000KVA Transformer at Cocoa House Complex, Ibadan. Odu’a Investment Company Limited, Ibadan. 2011
1.15 Connection of reconstructed HOD’s Office and Staff Rooms at Microbiology Department to Mains Power Network, (I.G.R. Project) University of Ibadan, Ibadan. 2011
1.16 Supply and installation of Oil Blast Circuit Breakers (OCB). Obafemi Awolowo University, Ile-Ife, Osun State. 2010
1.17 Repairs and servicing of 5nos 11KV Oil Circuit Breakers. Cocoa Research Institute of Nigeria (CRIN), Ibadan. 2008
1.18 Refurbishment of the 250KVA Generator at Main Power House. Cocoa Research Institute of Nigeria (CRIN), Ibadan.  
1.19 Laying and termination of 900 meters 3.3KV 3 x 185mm2 XLPE Cables at Asejire Water Works, from the power House to the low lift pump. Water Corporation of Oyo State. 2006
1.20 Servicing of two 1000KVA 11/0.415KV 11KV HT Transformers and Circuit Breakers.   Odu’a Investment Company Limited, Ibadan. 2008
1.21 Repair of faulty 200KVA 11/0.415KV Transformer at Junior Staff Quarters. Cocoa Research Institute of Nigeria (CRIN), Ibadan.  
2.00   WATER PROJECTS,ROAD, LANDSCAPING, AND BUILDING CONTRUCTIONS    
  2.01 Rehabilitation of Ejigbo Water Supply Scheme involving raising of dam embankment, laying of 300mm steel pipes, construction of rising Main, laying of 4000mtrs,100 mm UPVC pipes, construction of 200cu.m overhead tank and stanchion, construction of clarifier and spillway in Ejigbo, Osun State. Ogun Oshun River Basin Development Authority, Abeokuta. 2011
2.02 Syncronization of old and new water resources supply scheme at Ife-Odan, Osun State Ogun Oshun River Basin Development Authority, Abeokuta 2017
2.03 Rehabilitation works on Oyan Dam Irrigation scheme, Oyan Dam Project Ogun Oshun River Basin Development Authority, Abeokuta 2016
2.04 Construction of Landscaping and Gate House for the 33/11 KVA Substation at the University of Ibadan. University of Ibadan, Ibadan 2012
2.05 Renovation of Head of Station/Entomology/Microbiology and Processing Plant Building       Nigerian Stored Products Research Institute, Ibadan. 2012. 2012
2.06 Road Rehabilitation at Junior Staff Quarters. Cocoa Research Institute of Nigeria, Ibadan. 2009
2.07 Completion of Landscaping and drainage at the ERLS Building. Cocoa Research Institute of Nigeria (CRIN), Ibadan. 2009
2.08 Landscaping of ERLS Building. Cocoa Research Institute of Nigeria (CRIN), Ibadan. 2008
2.09 Provision of strengthening structure for the seed garden project. Cocoa Research Institute of Nigeria (CRIN), Ibadan. 2010
2.10 Construction of Six (6) nos of medium size Green House. Cocoa Research Institute of Nigeria (CRIN), Ibadan. 2006
2.11 WATER PROJECTS    
2.12 Rehabilitation works on Ikere George Dam, Mechanical & Electrical and Camp Houses. (Electrical, Mechanical and Civil works) in Oyo State.   Ogun Oshun River Basin Development Authority, Abeokuta. ü
2.13 Drilling of Hand Pump Boreholes at Kajola Local Government in Oyo State. Ogun-Oshun River Basin Development Authority, Abeokuta. 2010
2.14 Drilling and Reticulation of 2-Panel Solar Powered Borehole at Jobele in Afijio Local Government of Oyo State.   Ogun Oshun River Basin Development Authority, Abeokuta 2012
2.15 Drilling of 2 nos Hand Pump-Fitted Boreholes at Onibeere and Kososi Village in Atiba Local Govt. of oyo state. Ogun Oshun River Basin Development Authority, Abeokuta 2011
2.16 Drilling of 3 nos Hand Pump Boreholes at Kajola Local Government in Oyo State. Ogun-Oshun River Basin Development Authority, Abeokuta. 2010
2.17 Drilling of 2nos motorized boreholes, construction of switch houses and reticulation work. Cocoa Research Institute of Nigeria (CRIN), Ibadan. 2007
3.00 STEEL CONSTRUCTION    
3.01 Construction and Installation of Braithwaite Water Tank of 200 CU.M Ogun Oshun River Basin Development Authority 2012
3.02 Construction of Stanchion for 45,000 Liters Overhead Water Tank Cocoa Research Institute of Nigeria 2007
3.03 Construction and erection of 5,000 Galons Overhead Water Tank     2002
  •